Most buyers compare generator sets on price per kVA. That number decides almost nothing about what the machine costs to own. On a genset that runs 2,000 hours a year, fuel usually accounts for 60–70% of total operating cost — far more than the purchase price difference between two suppliers. This guide shows you exactly how to estimate fuel burn, convert it into cost per kWh, and size a fuel tank that actually covers a working shift.
All figures below are worked examples built on stated assumptions. Treat them as a method, not as a specification for a particular model — always confirm the fuel curve on the datasheet accompanying your own unit.
Fuel consumption is not one figure per generator. It moves with three variables:
That gives the working equation:
Litres per hour ≈ kW at the load point × litres per kWh at that load point
The second half of that sentence matters. Litres per kWh is not constant. As load drops, the engine keeps burning fuel just to stay at speed, so efficiency falls.
Assumptions used for the table: power factor 0.8, 210 g/kWh at 100% load, diesel density 0.84 kg/L, and typical part-load penalties of about 12% at 75% load, 36% at 50% load and 92% at 25% load. Your engine's own fuel curve will differ — the pattern will not.
| Rating (kVA) | Rated kW | 100% load (L/h) | 75% load (L/h) | 50% load (L/h) | 25% load (L/h) |
|---|---|---|---|---|---|
| 20 | 16 | 4.0 | 3.4 | 2.7 | 1.9 |
| 50 | 40 | 10.0 | 8.4 | 6.8 | 4.8 |
| 100 | 80 | 20.0 | 16.8 | 13.6 | 9.6 |
| 200 | 160 | 40.0 | 33.6 | 27.2 | 19.2 |
| 400 | 320 | 80.0 | 67.2 | 54.4 | 38.4 |
| 600 | 480 | 120.0 | 100.8 | 81.6 | 57.6 |
Read the 100 kVA row carefully. Halving the load from 80 kW to 40 kW does not halve fuel burn — it falls from 20 to 13.6 L/h, a 32% reduction. You still pay 68% of the fuel bill for half the useful work. That is why oversizing "for safety" is one of the most expensive habits in generator selection.
Dusty sites deserve their own note here. Engine filtration and cooling performance, not paint finish, decide whether the fuel curve on the datasheet survives a quarry or a coastal yard. On a site where the concurrent load works out at roughly 30–40 kW, sand and dust resistant 65kVA diesel generator is the frame worth pricing against the standard canopy version, because the cost difference is small next to a year of extra filter changes.
Cost per kWh is the only fair way to compare a generator against the grid, against a solar hybrid, or against a rival supplier's package. Multiply the litres-per-kWh figure at your real load point by your delivered diesel price.
At 75% load, the assumptions above give 0.28 L/kWh. The table converts that into currency:
| Diesel price (per litre) | Cost per kWh at 75% load | Cost per kWh at 100% load | Cost per kWh at 50% load |
|---|---|---|---|
| $1.00 | $0.28 | $0.25 | $0.34 |
| $1.20 | $0.34 | $0.30 | $0.41 |
| $1.50 | $0.42 | $0.38 | $0.51 |
Two practical conclusions:
If your site operates 8 hours a day, 300 days a year, a 100 kVA set at 75% load burns roughly 16.8 × 2,400 = 40,320 litres annually. At $1.20/L that is about $48,400 a year — enough to justify a serious look at load management before you ever compare brand premiums.
Tank capacity is usually decided last, and it is the decision that most often causes downtime. The rule: tank volume should cover your longest unrefuelled period with a margin, not your average day.
| Tank capacity | Runtime at 75% load, 100 kVA set | Covers |
|---|---|---|
| 100 L | 6.0 hours | A short shift only — needs mid-shift refuelling |
| 200 L | 11.9 hours | One 8–10 hour shift with margin |
| 400 L | 23.8 hours | Two shifts, or one shift plus standby coverage |
| 600 L | 35.7 hours | 24/7 operation with daily refuelling |
For mobile and rental applications, a base tank of 8–12 hours at rated load is the practical minimum, because refuelling access on remote sites is the constraint, not tank cost. For stationary standby, 8 hours at full load is the common specification and is often a code requirement — check local rules before you fix the size.
Two details buyers forget: usable capacity is usually 90–95% of nominal (you cannot draw to the bottom), and you should never plan to run below about 25% tank level, because sediment and water sit at the bottom and get picked up by the suction line.
Load factor is the ratio of average load to rated output over a period. A set with a 0.75 load factor runs efficiently. A set with a 0.3 load factor is being killed slowly.
Running a diesel genset below roughly 30–40% of rated load for long periods causes wet stacking: combustion temperatures stay too low to burn off unburnt fuel, which forms carbon deposits on injectors, turbochargers and exhaust. Symptoms include black exhaust slime, rising oil consumption, and a set that eventually cannot reach rated output. It is a maintenance cost, not just a fuel cost, and it is the point where routine servicing turns into Diesel generator maintenance and repair work that a normal service interval cannot absorb.
Practical fixes, in order of cost:
For remote or off-grid work, the comparison is no longer diesel versus diesel.
| Option | Fuel cost characteristic | Maintenance interval | Best fit |
|---|---|---|---|
| Diesel only | Full fuel cost for every kWh, 0.25–0.35 L/kWh | 250–500 hours between services | High load, short duration, or where fuel logistics are easy |
| Diesel-solar hybrid | Solar covers daytime load first; diesel runs fewer hours | Engine hours drop sharply, so service intervals stretch in calendar terms | Daytime-heavy loads, remote sites with expensive fuel delivery |
| Gas (LPG/CNG) | Often cheaper per kWh where gas is piped, higher per-kWh where it is trucked | Similar to diesel, different fuel storage rules | Sites with a reliable gas supply and long run hours |
A hybrid solar panel and generator setup does not eliminate the generator — it changes its duty from continuous to backup. That reduces fuel burn, engine hours, noise and emissions at the same time. The trade-off is capital cost and the space and maintenance that a PV array and battery bank require. Model the numbers on your own load profile before committing: a site that runs mainly at night will see far less benefit than one that runs through the day.
Use this before you request quotations, so every supplier quotes against the same load case:
Repeat step 5 for the rating one size up and one size down. The cheapest purchase price and the cheapest cost per kWh are frequently different machines.
How much fuel does a 100 kVA generator use per hour?
At 0.8 power factor and 100% load (80 kW), roughly 20 litres per hour on the assumptions above. At 75% load, about 16.8 L/h; at 50% load, about 13.6 L/h. Use your engine's fuel curve for a binding figure.
How do I convert kVA to kW?
Multiply kVA by the power factor. For most industrial sets the power factor is 0.8, so 200 kVA = 160 kW. If a supplier quotes kVA but your load is calculated in kW, convert before you compare — otherwise you are pricing two different machines.
Does running a generator at low load save fuel?
It saves fuel in absolute litres per hour, but not per kWh. Efficiency falls sharply below 50% load, and sustained running below 30–40% causes wet stacking and carbon build-up. Size for 60–80% load as a rule.
How many litres per kWh should I budget?
For a well-loaded diesel set, 0.25–0.30 L/kWh is a realistic planning band. Add 15–25% if the set will mostly run at half load, and add more at altitude or in high ambient temperatures, where output derates and fuel per kWh rises.
How big a fuel tank do I need?
Cover your longest period without refuelling, plus 10–20% margin, and remember only 90–95% of nominal capacity is usable. For a 100 kVA set at 75% load, a 200 L tank gives about 12 hours; a 400 L tank about 24 hours.
Does a solar hybrid really cut fuel cost?
It cuts fuel by cutting generator run hours, so the saving depends entirely on how much of your load falls in daylight. Model it against your own load profile — for night-heavy loads the benefit is small, for day-heavy remote loads it can be substantial.
Why is my generator using more fuel than the datasheet says?
Common causes are lower-than-assumed load factor, a dirty air filter or injectors, incorrect injection timing, high altitude or ambient temperature, and fuel leaks on the return line. Check the load reading at the panel first — it explains most of the gap. If it does not, Diesel generator maintenance tips and best practices will usually trace the rest: filters, injection timing, fuel quality and return-line leaks.
A fuel-efficient machine is not the one with the best headline number; it is the one matched to your load. Ask for the fuel consumption curve across 25%, 50%, 75% and 100% load, the rated power factor, the derating figures for your site altitude and ambient temperature, and the tank capacity at rated load. A supplier who cannot produce those four items is quoting a price, not a power solution.
Once you know your load profile and your cost per kWh, the purchase decision becomes straightforward arithmetic — and the machine that looked cheapest at quotation stage often is not the one that is cheapest to run.